• Skip to Main Content
  • A- A A +
  • . .

Archived - FC and A/A and E/S

Sr.No Title Issue date Documents
71 Foot Over Bridge on 60 M & 45 M Master Plan Road at Dwarka. 23-Aug-2019

pdfSize :1.32 MB

72 Construction of 2 level deck parking , development of plotted area and re-development of surface. parking at Mega Housing behind D-6, Vasant Kunj. 23-Aug-2019

pdfSize :1004.76 KB

73 Name of Work:- D/o Sports Complex at Sector-8 Dwarka 20-Aug-2019

pdfSize :553.48 KB

74 D/o Land at Dwarka Phase-II (224.90 Hect. of land) 19-Aug-2019

pdfSize :2.14 MB

75 Restoration and Rejuvenation of River Yamuna Flood Plains. Sh. Asita -Old Railway Bridge to ITO Barrage (Eastern Bank.) 04-Jun-2019

pdfSize :908.25 KB

76 Construction of HIG (Multi-Storeyed) Houses including ,internal Development & electrification in Sector 19B, Dwarka,PH-II (A turnkey project) 28-Jan-2019

pdfSize :610.98 KB

77 Providing and Installing Open equipments (16 Nos. each) with SBR Flooring in 60 Park of DDA 08-Oct-2018

pdfSize :751.81 KB

78 Providing and Installing Open equipments in 38 parksof DDA with SBR Flooring and left out (SBR)Flooring of Previous work in DDA Parks, South Zone 08-Oct-2018

pdfSize :648.2 KB

79 Providing and Installing of 55 open Gym equipments comprising of 16 pieces of equipments with SBR flooring in verious DDA Parks of Rohini and North Zone 08-Oct-2018

pdfSize :811.03 KB

80 Upgradation of fire protection and ventilation system of Vikas Sadan 31-May-2018

pdfSize :597.2 KB