211 |
Secured Advance in r/o unfinished metal products. |
EM1(10)94/Vol.I/3615 Dt. 22.2.95 |
22-Feb-1995 |
Size :257.44 KB
|
212 |
Use of Design mix concrete in DDA works. |
EM1(10)94/Vol.IK.1860 Dt. 30.1.95 |
30-Jan-1995 |
Size :193.12 KB
|
213 |
Construction of huts by the labour of Construction Agency at the Construction Building. |
EM1(10)94/15214 Dt. 25.11.94 |
25-Nov-1994 |
Size :570.7 KB
|
214 |
Critical examination of the role of supervising staff before sanction of RIS. |
EM1(10)94/14274 Dt. 8.11.94 |
08-Nov-1994 |
Size :215.89 KB
|
215 |
C.V.C Advice for maintaining JE records/material at site register. |
EM1(10)83/Vol. IX10373 |
04-Aug-1994 |
Size :688.86 KB
|
216 |
Supply of potable water in labour camps. |
EM1(10)83/Vol.IX /6388 |
19-Apr-1994 |
Size :239.15 KB
|
217 |
Recording of reasons for the deviations made from the provisions of I.S. Code while designing the projects. |
EM1(10)83/16828 Dt. 6.12.93 |
06-Dec-1993 |
Size :232.32 KB
|
218 |
Initial load testing of piles. |
EM1(10)83/Vol.IX/12493 Dt. 20.9.93 |
20-Sep-1993 |
Size :723.11 KB
|
219 |
Providing Gaps in between the adjacent tiles laid for covering control verges and foot oaths/pavements. |
EM1(10)83/Vol.IX/12843 Dt. 15.9.93 |
15-Sep-1993 |
Size :352.92 KB
|
220 |
Removal of jhugies from Construction sites by the contractors after completion of works. |
EM1(10)83/9147 Dt. 24.6.93 |
24-Jun-1993 |
Size :260.81 KB
|