Sl. No. | Wetland Name | Geo-coordinated | District (s) in which the Wetland is located | Khasra No/Areas | Remarks |
---|---|---|---|---|---|
1 | Sanjay Lake | 28° 36' 52.234" N 77° 18' 7.147" E | East |
170000 sq. mtrs. /17 ha |
To improve the water body, wok of removal of waterweeds has been completed. Restoration work of baffle reactor and constructed wetland has been completed. In-situ bio-remediation is planned to improve the quality of water. |
2 |
West Vinod Nagar |
East |
Area – 3.4 Ha |
Waterbody will be developed by DDA and NOC has been given to DJB for rejuvenation. |
|
3 |
Shastri Park |
East |
1000 sq. mtrs. Khasra no. 109 |
Water body is dry and source of water is rainfall only. Installation/construction of decentralized wastewater treatment plant on constructed wetland technology having 50 KLD capacity for park and water body has been done. |
|
4 |
Nand Nagari (2) Mandoli |
East |
K No.911, 912/3.4027ha |
Overflow from existing drain has been connected to the water body. Improvement of boundary wall of water body has been done. Water body to be developed as recharge basin for excess storm water runoff. |
|
5 |
Smriti Van Lake (Kondli) |
East |
580, 581, 582, 750, 751, 749, 752,754, 759, 753 etc. |
STP treated effluent is being released in water body. However it has been observed there is no retention of water in Water body. Drains have been connected to the water body to make it a recharge basis for storm water runoff. Landscaping work around water body is completed. Shrubs have been planted & grassing has been done. |
|
6 |
Sunder Nagari |
East |
0.15ha |
NOC given to DJB for rejuvenation. |
|
7 |
Maharaja surajmal park |
North East |
K No. 94 /0.75ha. |
Water body is dry and source of water is rainfall only. It has been observed that there was no retention of water during rainy season as its bottom is highly porous. The water body has been connected with surrounding peripheral drain for collection of storm water during rainy season for ground water recharge. |
|
8 |
Prasad Nagar Lake |
North |
(a) K No. 578/ 0.28ha |
The Water body is wet perennial due to underground streams. In-situ bioremediation is being done to improve the water quality. |
|
9 |
Siraspur |
North |
(a)162 (14‐10)/1.886ha |
NOC given to DJB for rejuvenation. |
|
10 |
Tikri Khurd Lake |
North |
11//24 min., 25 min., 12//23, 16//1, 2, 3, 10 min., 17//4, 5, 6, 7, 14 min, 15 min. |
NOC given to DJB for rejuvenation. |
|
11 |
Avantika (H) District Park at Avantika, Rohini (A), Sector‐1 |
North West |
1.922 ha |
NOC given to DJB for rejuvenation. |
|
12 |
Avantika (H) District Park at Avantika, Rohini (B), Sector‐1 |
North West |
3.8745ha |
NOC given to DJB for rejuvenation. |
|
13 |
Bhalswa Lake |
North West |
LAKE 112.68 Acre (45.6ha.) |
NOC given to DJB for rejuvenation. |
|
14 |
Bhalswa (H) Jahangirpuri, Behind Sanjay Enclave |
North West |
2.162 ha |
This is a dry water body & source of water is rainwater. The water body acts as recharge basin during rainy season. Slopes of surrounding area are being improved towards the pond to enhance the rainwater recharge. To make sustained flow of water a wet land based STP of 250 KLD capacity has been planned. |
|
15 |
Swaran Jayanti Park |
North West |
1ha |
For sustained availability of water in the water body, an 1 (one) MLD constructed wetland based STP has been installed. |
|
16 |
District Park 100 hact. (formal Garden, Swarn Jayanti Park, Sec‐ 10, Rohini ) |
North West |
0.7ha |
For sustained availability of water in the water body, an 1 (one) MLD constructed wetland based STP has been installed. |
|
17 |
District Park 100 hact. (Informal Garden, Swarn Jayanti Park, Sec‐ 10, Rohini ) |
North West |
1.922 ha |
For sustained availability of water in the water body, an 1 (one) MLD constructed wetland based STP has been installed. |
|
18 |
District Park (at Sector‐20, Rohini (Phase‐3) |
North West |
0.327 ha |
||
19 |
NHP No. 3 at Sector 23, Rohini (Jheel Wala Park) |
North West |
0.04 ha |
In-situ Bio-remediation of water has been carried out. To make the sustained flow of water into the lake, a 50 KLD STP has also been installed. |
|
20 |
Dhir pur F/74 |
North West |
(a) 293,296,297, 299,300,301, 302,303,322, 355,356 total=7.0 acre (2.823ha) |
Water body is developed and is partially wet. It is fed by rainwater at present. To make the sustained flow of water available, STP of 10KLD capacity has been planned. 10 KLD STP is in tendering stage. |
|
21 |
Mangol pur kalan F/90 (Park and Pond Area, Sector‐3, Rohini) |
North West |
(b)28//4/1min, 2min,6,7min /1.8729ha |
||
22 |
Mangol pur khurd F/74,89 (Awantika) |
North West |
(a)18 (5‐12), 19(6‐13),21(3‐ 14), 22(4‐ 14),23(3‐0), 74(4‐6), 75(1‐ 14), 76(2‐11), 77(5‐5), 78(3‐ 4), 79(2‐ 2),80(2‐13), 81(2‐19), 83(1‐ 3), 88(2‐1) /6.837ha |
NOC given to DJB for rejuvenation. |
|
23 |
Pooth Kalan (Park & Sardar Patel Lake) |
North West |
(a)30//24(4‐9) 25(4‐16) 41//4/2(0‐14) 5(4‐2) 42//1(4‐ 16) 2(4‐16) /3.09ha |
Area of the lake is about 4.60 Acres. Waterbody is wet. At present 5’ depth of water is available in this water body. Source of water is rain-water. To make the sustained flow of water available, a wetland based wastewater treatment plant of 100 KLD has been planned. |
|
24 |
District Park Pitampura |
North West |
4.04 ha |
A dry Water body having area 4.04 ha is fully developed. Railing around water body is completed. Provision wetland based 250 KLD STP is in progress. |
|
25 |
District Park, Harsh Vihar, Pitampura |
North West |
2.47 acre |
A Wastewater Treatment Plant of 60 KLD capacity has been installed. |
|
26 |
Rithala F/89 (Park and Water Body at Rithala, Sector‐5) |
North West |
(a)672&673 (75‐2) 1.444 ha |
NOC given to DJB for rejuvenation. |
|
27 |
Shalimar F/79 Sahipur Johar |
North West |
NOC given to DJB for rejuvenation. |
||
28 |
Chirag delhi F/66 |
South |
(a)196(2‐2)/0.294ha |
NOC given to DJB for rejuvenation. |
|
29 |
Hauz Khas |
South |
K.No. 150‐158 Area: 142.35 Ha |
The existing inflow of water from the Sanjay Van drain required treatment, which is being done through, in situ treatment methods viz. bio-remediation and aerators. |
|
30 |
Hauz Khas (District Park at Hauz Khas) |
South |
8ha |
NOC given to DJB for rejuvenation. |
|
31 |
Katwaria sarai F/74 |
South |
(a)265(29‐3)/3.9197ha |
NOC given to DJB for rejuvenation. |
|
32 |
Khirki (Satpula Lake) |
South |
(c)155 (135‐11) |
NOC given to DJB for rejuvenation. |
|
33 |
Ladha sarai F/74 |
South |
(a)3(8‐13)/1.087Ha |
NOC given to DJB for rejuvenation. |
|
34 |
Ladha sarai F/75 |
South |
(b) 14 min (0‐ 9)/0.011ha |
NOC given to DJB for rejuvenation. |
|
35 |
Lado Sarai (Behind Ahinsa Sthal) |
South |
(b)335min(2‐0)/0.267ha |
NOC given to DJB for rejuvenation. |
|
36 |
Mehrauli, Sanjay Van (M.P. Green Area at Sanjay Van) |
South |
The existing inflow of water from the drain required treatment, which is being done by DJB through, in situ treatment methods viz. installation of floating wetlands, in-situ bio-remediation and aerators. |
||
37 |
Mehrauli (kishangarh) (Baba Adhrang Nath) |
South |
(c)1220(13‐3) (NEW) (OLD‐ 2741,2026,167 5) /1.779ha |
The water body having area of about 0.3 Acre is fully developed and is dry/intermittent. The source of water is only run off / rainwater interrupted from the main road. To rejuvenate the waterbody, it has been connected to the nearby STP treated waterline. In-situ bio-remediation has been planned for further treatment STP water. |
|
38 |
Mehrauli (kishangarh) |
South |
(i) Old 2321/1224 (1‐5) New 537(2‐10) |
NOC given to DJB for rejuvenation. |
|
39 |
Mehrauli Complex, Phase‐I |
South |
3.53 Ha |
||
40 |
Saidabad |
South |
NOC given to DJB for rejuvenation. |
||
41 |
Shah pur jat |
South |
294 (5‐11)/0.683ha |
NOC given to DJB for rejuvenation. |
|
42 |
Smriti Van Lake (Vasant Kunj) |
South |
661, 662, 663, 664, 689, 690, 691, 692, 697 to 700 min. |
The existing inflow of water from the drain required treatment, which is being done by, in situ treatment methods viz. in-situ bio-remediation and aerators. DJB has been given NOC for installation of decentralized wetland based wastewater treatment plant, which is under construction. |
|
43 |
VASANT UDHYAN (OPPOSITE PVR PRIYA) |
South |
Water body is dry and source of water is rainfall only. STP waterline has been laid to supply water in the park. In-situ bio-remediation has also been planned to improve quality of water. |
||
44 |
Vasant Vatika Sector‐C, Vasant Kunj |
South |
0.43 Ha |
Water body is dry and source of water is rainfall only. STP waterline has been laid to supply water in the park. In-situ bio-remediation has been planned to improve quality of water. |
|
45 |
Bahapur (M/o M.P. Green Area, Maa Anandmai Marg) |
South East |
(c) 630/2 (18‐ 9)/2.528ha |
The water body has been taken up for rejuvenation. The water body at present is receiving water from nearby drain which is contaminated with sewage. Construction of 250 KLD constructed wetland is under Progress. |
|
46 |
Aastha Kunj Ph‐I ll 11nd Ill (Distt. Park, Kalkaji i/c park around Kalkaji Temple) Garhi jharia maria F/66 |
South East |
1 MLD Wastewater treatment plant is being planned to rejuvenate the wetland. |
||
47 |
Ashoka Park, New Friends Colony |
South East |
0.3ha |
STP treated water from DJB Okhla Plant is being used to fill up the lake. A polishing unit of 50 KLD capacity has been installed for polishing the STP treated effluents. The works of landscaping, provision of railing around water body and installation of fountain have also been carried out. |
|
48 |
Tughlakabad |
South East |
0.55 Ha |
Rainwater accumulates in water body from the sub-terrain. A decentralized wetland based wastewater treatment plant from sewer line to water body is in planning stage. Landscaping work and provision of railing has also been planned around the water body. |
|
49 |
Dwarka (Water Body at Central Nursery, Sector‐5) |
South West |
0.16 ha |
Water body has been made functional by de-silting. Treated effluent from STP is being discharged in to the water body. To further improve the quality of treated effluent, a constructed wetland around water body has been constructed and aerators have been installed in the water body. |
|
50 |
Nasirpur F/02 |
South West |
612(13‐19)/1.764ha |
NOC given to DJB for rejuvenation. |
|
51 |
Nasirpur F/03 |
South West |
111(0‐4)/0.005ha |
NOC given to DJB for rejuvenation. |
|
52 |
Nasirpur F/06 |
South West |
K.No. 109 Area: 0.6782ha |
NOC given to DJB for rejuvenation. |
|
53 |
Pochan Pur |
South West |
34(7‐6)/1.016ha |
A STP of 50KLD has been installed to fill the water body. However, there is no retention of water in it due to high percolation rate. Repair to damage retaining wall around the waterbody has been done. |
|
54 |
Water Body at Sector‐23, Dwarka |
South West |
0.60 ha |
STP has been commissioned and water is being added to the water body. Broken fencing repaired & existing wetland based STP has been made functional. |
|
55 |
Garhi peeran F/89 @ Peeragarhi (Park and Lake at District Park, Paschim Vihar) |
West |
1.47ha |
Water body is wet and it is properly maintained. Treated effluent from Keshopur STP of DJB is being discharged into the waterbody. |
|
56 |
Madi pur F/74 (Park and Lake at Bhagwati Talab, Madipur) |
West |
1298(23‐2)/3.1ha |
Water body is wet and fully developed. 100 KLD STP has been installed to fill the lake. In-situ bio-remediation has been planned to improve the quality of water. |
|
57 |
Madi pur F/75 (Park and Lake at Madipur Village) |
West |
K.No. 1300 Area: 0.829ha |
NOC given to DJB for rejuvenation. |
|
58 |
Tihar Lake |
West |
1533(92‐18)/3.05ha |
NOC given to DJB for rejuvenation. |
|
59 |
Shahbad Mohd.Pur F/03 |
New Delhi |
1/72(28‐17)/3.268 |
NOC given to DJB for rejuvenation. |
|
60 |
Shahbad Mohd.Pur F/04 |
New Delhi |
1/535(31‐6)/4.168 |
NOC given to DJB for rejuvenation. |
|
61 |
Todapur |
New Delhi |
114 (8‐13)/1.087ha |
NOC given to DJB for rejuvenation. |
|
62 |
Todapur |
New Delhi |
142‐143‐145 (3‐3)/0.441Ha |
NOC given to DJB for rejuvenation. |
|
63 |
Todapur |
New Delhi |
NOC given to DJB for rejuvenation. |
||
64 |
Dhaula Kuan (Kitchner Lake) |
Central |
15000 sq. mtrs. K.No. 562/181 (Min) /5.89 Ha |
The water body has been developed as recharge basins for storm water runoff from nearby box drain and there is huge inflow of water during this rainy season In-situ bio-remediation has been planned to improve the quality of water. |
WETLANDS/WATERBODIES INSIDE THE PARKS OF DDA