• Skip to Main Content
  • A- A A +
  • . .

Archived Circular

Sr.No Title File No Issue date Documents
551 Regarding precaution to taken while handing over the building for occupation by tenants. EM. 1(10)83/621 09-Jan-1987

pdfSize :995.46 KB

552 Regarding testing of material used in the works. EM. 1(10)83/14752 30-Dec-1986

pdfSize :278.67 KB

553 Regarding specific place for issue of stores and materials. EM. 1(10)83/14711 29-Dec-1986

pdfSize :477.36 KB

554 Inspection of work by EE, SE and CE. EM. 1(10)83/14712 29-Dec-1986

pdfSize :526.95 KB

555 Regarding tall building, residential internal sewage drainage system. EM.1(10)83/14592 Dt: 24.12.1986 24-Dec-1986

pdfSize :240.56 KB

556 Disposal of observation taken by CE (QC) & CP EM. 1(10)83/14559 23-Dec-1986

pdfSize :300.47 KB

557 Regarding in reference of circular No. 168 EM.1(10)83/14320 Dt: 16.12.1986 16-Dec-1986

pdfSize :266.28 KB

558 Reg. Quarterly reports for works with estimated cost of Rs. 50,000 EM.1(10)83/1736 Dt: 7.12.1986 07-Dec-1986

pdfSize :581.14 KB

559 Regarding test of equipment's. EM.1(10)83/13747 Dt: 5.12.1986 05-Dec-1986

pdfSize :130.46 KB

560 Reg. Issue of material from the store. EM.1(10)83/22741 Dt: 7.11.1986 07-Nov-1986

pdfSize :215.04 KB