491 |
Costing details for Housing and Built Up Commercial Properties |
EM1(10)83/4128 Dt. 25.03.1992 |
25-Mar-1992 |
Size :544.94 KB
|
492 |
Disposal of Surplus/Unserviceable Stores |
EM1(10)83/560 Dt. 13.01.1992 |
13-Jan-1992 |
Size :257.48 KB
|
493 |
Revision of Solar Heating System in Future Staff Quarters |
EM1(10)83/145 Dt. 03.01.1992 |
03-Jan-1992 |
Size :256.88 KB
|
494 |
Protection of tree plantation in Delhi |
EM1(10)83/15429 Dt. 22.11.1991 |
22-Nov-1991 |
Size :203.7 KB
|
495 |
Approval of report/designs/drawings of Soil Consultants, Structural Consultants, Architectural Consultants. This supersedes Standing Instructions 338 dated 10.09.1991 |
EM1(10)83/14607 Dt. 31.10.1991 |
31-Oct-1991 |
Size :268.94 KB
|
496 |
Execution of outside plaster upto plinth level with cement mortar 1:4 on flats constructed by the DDA |
EM1(10)83/13475 Dt. 10.10.1991 EM8(18)91/QC/DDA/13475 Dt. 10.10.1991 |
10-Oct-1991 |
Size :523.72 KB
|
497 |
Use of Copper Wiring in DDA flats/buildings in places of aluminum conductor cable |
EM1(10)83/13474 Dt. 10.10.1991 EM8(19)91/QC/DDA/13475 Dt. 10.10.1991 |
10-Oct-1991 |
Size :309.79 KB
|
498 |
About approval of report of said Consultants Structural Consultant/Architectural Consultant |
EM1(10)83/11686 Dt. 10.09.1991 |
10-Sep-1991 |
Size :510.75 KB
|
499 |
Reg. The CTE during inspection of one of the work of DDA has deserved that the water supply |
EM1(10)83/8029 Dt. 14.06.1991 |
14-Jun-1991 |
Size :390.95 KB
|
500 |
Reg. Uniform Boosting Charges |
EM1(10)83/7151 Dt. 30.05.1991 |
30-May-1991 |
Size :177 KB
|